Fully Automatic Electric Water Heater Tank Production Machine

Product Details
Customization: Available
Concentrating: No
Working Temperature Range: Medium Temperature
Manufacturer/Factory, Trading Company
Gold Member Since 2017

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Plant Area
501~1000 square meters
Management System Certification
ISO 9001
  • Fully Automatic Electric Water Heater Tank Production Machine
  • Fully Automatic Electric Water Heater Tank Production Machine
  • Fully Automatic Electric Water Heater Tank Production Machine
  • Fully Automatic Electric Water Heater Tank Production Machine
  • Fully Automatic Electric Water Heater Tank Production Machine
Find Similar Products

Basic Info.

Model NO.
EN-EWH
Type
Pressurized
Application
Water Heater
Pipe Material
Stainless Steel
Product Type
Electric Water Heater Tank
Plate Size
600*500*2.0mm
Cover Size
320*170mm
Output
100 Set/ Hr (60L Single Bile)
Conveying Mode
Stainless Steel Plane Conveying
Standard Transmission Line Speed
0.7 M/Min
Stepless Speed Regulation
0.5-1.5 M/Min
Inner Wall
1.5mm Thick SUS201 Stainless Steel Plate
Heat Preservation Layer
50mm Thick, Rock Wool
out Wall
0.8mm Thick SUS201 Stainless Steel Plate
Cover
0.8mm Thick SUS201 Stainless Steel Plate
Skeleton and Column
Section Steel
Overflow Pipe
1.5 Inch Stainless Steel Pipe
Drainage Pipe, Ball Valve
2 Inch Stainless Steel Pipe
Electric Heating Tube
Stainless Steel Heating Pipe
Transport Package
Standard Export Packing
Trademark
Ensource
Origin
China
HS Code
8419191000
Production Capacity
10000sets/Year

Product Description

I.  Design parameters and specifications

1).Product type: Electric Water Heater tank

2). Plate size:L×W×H=600×500×2.0(mm);Cover size:D×H=320×170(mm)

3).Output:100 Set/ Hr(60L single bile)

4).Conveying mode: stainless steel plane conveying;

5).Standard transmission line speed:0.7 m/min, stepless speed regulation: 0.5-1.5 m/min;

6). Heating method:

The electric heating tube is used to centralize heating to assist hot air circulation in the oven.

The pretreatment tank liquid is heated directly by stainless steel heating tube.
 

Process flow:

No.

Process name

Process time (Min)

Process temperature(ºC

Remark

1

Pre-Degreasing

60

40~50

Electric heating

2

Degreasing

120

40~50

Electric heating

3

Washing1#

60

/

/

4

Washing2#

60

/

/

5

Blow water

/

Compressed air

/

6

Drying

480

120~150

Electric heating

7

Cooling

120

/

Fan

8

Unload

 

/

Manual

 

II. Equipment Specifications, Types and Budget Tables

No.

Name

Specifications and models

Qty

Unit

1

Pretreatment equipment

 

1

set

1.1

Tank

 

1

set

1.1.1

Pre-Degreasing

 

1

set

 

Size of inner :

L×W×H=2.2×0.7×0.5(m)

 

 

 

Inner wall

1.5mm thick SUS201 stainless steel plate

 

 

 

Heat preservation layer

50mm thick, rock wool

 

 

 

 

Out Wall

 

0.8mm thick SUS201 stainless steel plate

 

 

 

Cover

0.8mm thick SUS201 stainless steel plate

 

 

 

Skeleton and column

Section steel

 

 

 

Overflow pipe

1.5 inch stainless steel pipe

 

 

 

Drainage pipe, ball valve

2 inch stainless steel pipe

 

 

 

Filter net

Stainless steel material, 60 meshes

2

layer

 

Electric heating tube

Stainless steel heating pipe

25

KW

1.1.2

 

Degreasing

 

1

set

 

Size of inner :

L×W×H=2.2×1.4×0.5(m)

 

 

 

Inner wall

1.5mm thick SUS201 stainless steel plate

 

 

 

Heat preservation layer

50mm thick, rock wool

 

 

 

Out Wall

 

0.8mm thick SUS201 stainless steel plate

 

 

 

Cover

0.8mm thick SUS201 stainless steel plate

 

 

 

Skeleton and column

Section steel

 

 

 

Overflow pipe

1.5 inch stainless steel pipe

 

 

 

Drainage pipe, ball valve

2 inch stainless steel pipe

 

 

 

Filter net

Stainless steel material, 60 meshes

2

layer

 

Electric heating tube

Stainless steel heating pipe

45

KW

1.1.3

Washing1-2#

Each Including:

2

set

 

Size of inner :

L×W×H=2.2×0.7×0.5(m)

 

 

 

Inner wall

1.5mm thick SUS201 stainless steel plate

 

 

 

Skeleton and column

Section steel

 

 

 

Overflow pipe

1.5 inch stainless steel pipe

 

 

 

Drainage pipe, ball valve

2 inch stainless steel pipe

 

 

 

 

Filter net

Stainless steel material, 60 meshes

2

layer

1.2

Sprinkling System

 

4

set

1.2.1

Pre-Degreasing

 

1

set

 

Pump

2 in. Carbon steel pipe pump

, 1.5Kw

1

 

set

 

Seal ring

Vulnerable parts

 

 

 

Main pipe

2.5 inch galvanized pipe

1

set

 

Manifold pipe

1 inch galvanized pipe

5

 

Row

 

Nozzle

 

Fast-loading universal plastic nozzle

70

 

pi

 

ball valve

2.5 inch ordinary ball valve

1

set

1.2.2

 

Degreasing

 

1

set

 

Pump

2.5 in. Carbon steel pipe pump

, 4Kw

1

set

 

Seal ring

Vulnerable parts

 

 

 

Main pipe

 

2.5 inch galvanized pipe

1

set

 

Manifold pipe

1 inch galvanized pipe

7

Row

 

Nozzle

Fast-loading universal plastic nozzle

98

pi

 

ball valve

2.5 inch ordinary ball valve

1

set

1.2.3

Washing1-2#

Each Including:

2

set

 

Pump

2 in. Carbon steel pipe pump

, 1.5Kw

1

set

 

Seal ring

 

Vulnerable parts

 

 

 

Main pipe

2 inch galvanized pipe

1

set

 

Manifold pipe

1 inch galvanized pipe

5

 

Row

 

 

Nozzle

 

Fast-loading universal plastic nozzle

70

 

pi

 

 

ball valve

 

2.5 inch ordinary ball valve

1

set

1.3

 

Sprinkling Room

 

1

set

 

 

Size of inner :

L×W×H=12×2.0×0.7(m)

 

 

 

 

Inner wall

 

1.2mm thick SUS201 stainless steel plate

 

 

 

 

Top wall

 

1.2mm thick SUS201 stainless steel plate

 

 

 

structure

Adopt Cover plate structure, convenient maintenance

 

 

 

 

Floor

 

1.5mm thick SUS201 stainless steel plate

 

 

 

 

Skeleton and column

 

Section steel

 

 

1.4

 

Water blowing device

 

1

set

 

structure

Use compressed air to blow water (air source provided by customers)

1

set

 

Nozzle

Special nozzle

1

set

 

pipe

galvanized pipe

1

set

1.5

Waste Gas Discharge System

 

1

set

 

Blower

Centrifugal fan,2.2Kw

1

set

 

Discharge pipes

made from  PVC

25

 

mi

2

Conveyor system

 

1

set

 

Conveying mode

Stainless steel plane conveying

 

 

 

Conveyor specifications

L×W×H=22.1×1.8×0.7(m)

 

 

 

Speed adjustable range

0.5-1.5m/min;

 

 

 

Chain

2 inch stainless steel roller chain

92

meter

 

Shaft piercing

Stainless steel shaft, 150 mm apart

306

pi

 

Mesh belt

Line diameter 2.0mm, 1.7m wide SUS304 stainless steel mesh.

46

meter

 

track

stainless steel

1

set

 

Skeleton and column

Section steel

1

set

 

Drive device

3 Kw, 3 emergency stop switches

1

set

 

Tension device

Screw tensioning form.

1

set

 

Bracket

Adjustable foot cup

1

set

3

Drying  oven

Temp.120~150ºC

1

set

 

Size of inner chamber

L×W×H=5.6×2.0×0.7(m)

 

 

 

structure

The baking furnace adopts a straight-through structure, and the exhaust gas discharge pipe is set at the inlet and outlet of the furnace to be outdoors.

 

 

 

Inner wall

 

1.0mm thick galvanized plate

 

 

 

Outer wall

 

1.0mm thick colour steel plate

 

 

 

Heat preservation layer

100mm thick, rock wool

 

 

 

Skeleton and column

Section steel

 

 

 

Waste gas discharge pipe

1.0mm galvanized plate

16

 

meter

4

Heating System

 

1

set

 

Maximum temperature

 

≤160ºC,Temperature is adjustable

 

 

 

Mode

Direct Heat Circulation by Hot Air with Electric Heat Pipe

 

 

 

Heating tube

Stainless steel heating pipe

65

kw

 

Hot air circulating fan

Water-cooled heat-resistant fan, 4kw, Foshan

1

 

set

 

Air trough and duct in furnace

11.2mm thick galvanized sheet

 

 

 

Heat exchange chamber

 

 

Inner wall 1.0 mm stainless steel plate, outer wall 1.2 mm thick cold-rolled plate, insulation layer 120 mm thick aluminium silicate fiber cotton

 

 

5

Cooling section

 

1

set

 

Size

L×W×H=2×2.2×0.6(m)

 

 

 

Wall

1.2mm Galvanized plate

 

 

 

Skeleton and column

 

Section steel

 

 

 

Blow

5 # Axial Flow Fan, 2.2kw, Foshan

1

set

 

Cooling fan

18 in. Foshan

2

set

 

Pipe

Φ500,1.0mm thick galvanized sheet

8

meter

6

Electrical Control System

 

1

set

 

control mode

Button control

 

 

 

 

Spray control system

4

set

 

 

Tank temperature control

2

set

 

 

Conveyor Control System

1

set

 

 

Temperature Control of Drying Furnace

1

set

 

 

Fan contro

2

set

7

Vulnerable parts

 

1

item

 

Pump Seal Ring

 

4

pcs

 

Pretreatment heating pipe

 

2

pc

 

Oven heating pipe

 

2

pcs

 

chain

 

1

meter

 

Mesh belt

 

1

meter

 

Pretreatment nozzle

 

40

pc

 

Temperature control

 

1

pc

 

Thermocouple

 

3

pc

 

AC contactor 25A-40A

 

2

pc

 

AC contactor 6A-25A

 

2

pc

 

Thermal relay 3A-15A

 

2

pc


III.Engineering service mode

1.The quotation includes the ex-factory price and tax of the equipment.

The following costs are excluded:

1)     No items are listed in the budget tables of waste water and waste gas treatment equipment, air compressor equipment, laboratory equipment, etc.

2)     Installation personnel visa fee, round trip travel fee, accommodation fee during installation and installation tools, etc.

3)     Transportation fees;

2. Construction period: design and manufacture time: 70 days;

Installation and commissioning time * number of people: 60 days * 4 people;

 (Customers provide the main installation equipment, including welding machine, cutting machine, etc., as well as the installation of auxiliary personnel not less than 4 people)

3. After-sales service mode:

(1)     The normal use of equipment is guaranteed for one year, and the guaranteed period starts from the date of final acceptance. The supplier shall be responsible for timely troubleshooting in accordance with the time required by the demander if there is a failure during the warranty period (the Demander shall be responsible for overseas travel, accommodation expenses and wages)

(2)     After the warranty period, according to the requirements of the demand side, the supplier provides timely telephone and network consulting services and other assistance. The cost of service (personnel, accessories, etc.) generated in the process of service shall be borne by the buyer.


IV. Product
Fully Automatic Electric Water Heater Tank Production Machine
Fully Automatic Electric Water Heater Tank Production Machine
Fully Automatic Electric Water Heater Tank Production Machine

Contact information:


 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier