Automatic Face Mask Making Machine Medical Mask Machine Clean Room
I.Clean Room Introduction: The production of medical masks requires a dust-free and sterile environment. The workshop should reach the requirements of a 100,000-level purification workshop. According to the United States Federal Standard (USA Federal Standard), the level of the purification workshop is set according to the number of dust particles per cubic meter> = 0.5μm. The 100,000-level purification workshop has less than 100,000 fine particles of 0.5 μm in each cubic meter.
II.Features of Clean Room: 1.Unique low vibration and low noise
2.Excellent air uniform distribution performance
3.Automatic wind speed constant or stepwise adjustment
4.Advanced mechanical properties and reliability
III.The Structural Materials Required for the Purification Plant Include: 1.Workshop walls and ceiling boards are generally made of 50mm thick sandwich color steel plates, which are characterized by beautiful appearance and strong rigidity. Arc wall corners, doors, window frames, etc. are generally made of special alumina profiles.
2.The floor can be epoxy self-leveling floor or high-grade wear-resistant plastic floor. If anti-static requirements are required, anti-static type can be selected.
3.The return air duct is made of hot-dip zinc sheet, which is pasted with flame-retardant PF foamed plastic sheet with good purification and heat preservation effect.
4.The stainless steel frame for efficient air outlet is beautiful and clean, and the painted aluminum plate for punching screen is not rusty and sticky, and easy to clean.
IV.100,000 Grade Purification Process for Mask Production Workshop: 1.The air supply system must undergo a three-stage filtration treatment of the primary, intermediate, and high-efficiency purification air supply systems. Ensure that the air sent into the room is clean air
2.The building envelope must ensure good air tightness, the building surface is smooth. no dust is generated, no dust is accumulated, and no leakage.